Repairs run through the Land Use Department
For a house that needs structural work, a new septic system or a major addition, the first county stop is the Land Use Department, which the county says is responsible for the planning and building functions. Its office is at 111 Mall Road in Ridgway, its phone number is 970-626-9775, and it lists Monday through Thursday, 8 a.m. to 4:30 p.m. The department notes that it does not generally enforce homeowners association covenants, which it calls a civil matter between the association and the owner. That matters for a buyer: a repair can be legal under the county code and still be limited by a neighborhood covenant.
The permit system
The Building Information page explains that the county uses a paperless permitting system called CloudPermit. All plans for a building or septic permit must be submitted in electronic PDF format, and permit payments are processed through the system by credit card or e-check; the county states a 2.4 percent fee on cards and $1.50 on e-checks. Inspections must be requested at least 24 hours ahead. For permits issued after May 1, 2024, you ask for the inspection in CloudPermit, and for earlier permits you call the Land Use office. The page links a building permit fee schedule that it says is for estimating only, so get a real estimate from the department before budgeting.
Codes and the foundation rule
The county says it re-adopted the 2018 International Building Code and the 2018 International Energy Conservation Code, and links the resolution that did so. It also points to the Colorado Wildfire Resiliency Code and lists a wildfire mitigation section of its land use rules. One rule is unusual and costly: under resolution 2021-049, as quoted on the page, footings, caissons and foundation wall inspections are performed by a professional engineer registered in Colorado, at the permittee's expense. After inspecting the caissons or footers and the foundation wall reinforcing steel, the engineer gives the Building Official a typed, stamped report. The report for caissons or footers must say they were observed to conform to the engineered design, and it must identify any watercourses or ditches on the parcel. A buyer pricing foundation work should add the engineer's time.
Before you buy or build
The page lists several resources under a "Before You Buy or Build" heading, including a note to prospective buyers, minimum dwelling standards, and a page on what requires a building permit. We did not open those documents, so we cannot say what they require. The county also lists state electrical and plumbing inspection numbers on the page, plus phone numbers for local utilities and the state water resources office; ask each directly about service and wells.
Before and after the repair
If a property is behind on its tax bill while it waits for repairs, read behind on property taxes in Ouray County, and if the owner would rather sell the house as it is, see selling a house fast in Ouray County. The Assessor's page says the Assessor reappraises real property every two years and that the county has a page on new construction, so a major rebuild may change the next valuation.
What this page could not confirm
We did not find a county page on repair-cost assistance, a list of approved contractors, or a rule on selling a house with open permits, and we do not state any here.
Frequently asked questions
How do I get a building permit in Ouray County?
The Land Use Department uses an online permitting system called CloudPermit. All plans for a building or septic permit must be submitted as electronic PDFs, and payment is by credit card or e-check through the system.
Who inspects a new foundation?
Under county resolution 2021-049, footings, caissons and foundation wall inspections are performed by a Colorado-registered professional engineer at the permittee's cost, who gives the Building Official a stamped report.
How far ahead do I request an inspection?
The county says all inspection requests must be made at least 24 hours in advance. For permits issued after May 1, 2024, request through CloudPermit; for earlier permits, call the Land Use office.
More Ouray County pages
- Ouray County overview
- Sell a house fast in Ouray County, Colorado
- Inherited or probate house in Ouray County, Colorado
- Foreclosure in Ouray County, Colorado
- Behind on property taxes in Ouray County, Colorado