House needs major repairs in La Plata County, Colorado
Updated November 3, 2026. Sources checked November 3, 2026.
A house that needs major repairs is a different project from a house that needs paint. Roof, foundation, septic, well and electrical work each touch a county rule, a permit or an inspection, and the order in which they are done decides whether the work holds up at sale. The county building division publishes the rules, and starting from them avoids the most common expensive mistake: doing the work first and asking about permits afterward.
Start with what the county already knows about the house
The building division keeps electronic building plans from 2019 onward and has none for permits issued before that. For older work, the division says old permit records can be requested by submitting a Parcel Research request through the Code Enforcement webpage. Either way, check the permit history before setting a repair budget, because work that was never permitted can change the scope of a repair.
Land use matters too. The county planning page says La Plata County allows one single-family residence on a legal lot of record with no land use permit required and no minimum size requirement, while a building permit is required for any structure larger than 200 square feet. The county generally uses performance based zoning, with the Animas Valley as the exception. The county's licenses page says the building code is chapter 18 of the county code and the land use code covers chapters 62 through 90, and that most changes to existing buildings, such as converting from residential to commercial use, need review through the building department.
Permits, codes and the current code cycle
Work done now falls under the codes the Board of County Commissioners has adopted. The building division lists the 2024 IRC, IBC, IPC, IMC and IFGC, effective July 1, 2026, the 2024 International Energy Conservation Code in its Colorado Model Electric Ready and Solar Ready form, the 2024 National Electric Code, and the Colorado Wildfire Resiliency Code, effective June 17, 2026. Electrical permits and inspections are handled by the state, not the county.
For a new single-family home, the division lists a full set of plans, a site plan showing distances to property lines, proof of water supply from a well permit or a water tap, proof of sewage disposal from a septic permit or a sewer tap, and a driveway permit from the county engineering department. A foundation plan from a licensed Colorado engineer is needed on high expansive soils, elevation certificates apply in floodplain hazard areas, and survey or soils reports may be required in geologic hazard areas. A repair project will not need every item, but the same offices handle the pieces it does need. The division also publishes a list of work exempt from a building permit under Building Code Section 105.2.
Timelines to plan around
On average, permitting takes between 4 and 6 weeks, provided all required documents are submitted. Once a permit is paid for, the holder has one year to begin work and request an inspection, and it stays active as long as consistent progress is shown each year through scheduled inspections. Inspections must be scheduled at least one business day in advance, by calling the Building Division or using the online permit portal, and same-day inspections are not available.
Two more points affect budgets. An address must be assigned to a lot before a permit can be obtained. And if you change the structure after plans are approved, you must submit revised plans electronically, which must be reviewed and approved before further inspections are scheduled, and additional review fees may apply and the project may be delayed.
Sell as-is or repair first?
The answer depends on what the repair unlocks. A repair that removes a financing obstacle can pay for itself in a wider buyer pool and a cleaner closing, while cosmetic work rarely does. For a failed septic system, a bad well or a structural problem, get the county-side answer first: which permit, which office, and how long. Then price the house against that answer. A seller who can show the repair scope, the permit status and the timeline gives a buyer something a vague note that the house needs work does not.
Related La Plata County pages
- Sell a house fast in La Plata County
- La Plata County foreclosure and public trustee sales
- Inherited or probate houses in La Plata County
- Behind on property taxes in La Plata County
- All La Plata County pages
Frequently asked questions
What building codes apply to repairs in La Plata County?
The county building division lists the 2024 IRC, IBC, IPC, IMC and IFGC effective July 1, 2026, the 2024 International Energy Conservation Code in its Colorado Model Electric Ready and Solar Ready form, the 2024 National Electric Code, and the Colorado Wildfire Resiliency Code effective June 17, 2026.
How long do I have to start work after a La Plata County permit is paid for?
Once you pay for the permit, you have one year to begin work and request an inspection, and the permit stays active as long as you show consistent progress each year through scheduled inspections.
Can I get a same-day building inspection in La Plata County?
No. The building division states that inspections must be scheduled at least one business day in advance and that same-day inspections are not available.
Who handles electrical permits for repair work in La Plata County?
The building division says that in Colorado, electrical permits and inspections are handled by the state, so electrical work follows the state process even when the rest of a project is permitted through the county.
Sources
- La Plata County Building Division, frequently asked questions
- La Plata County Planning, frequently asked questions
- La Plata County, licenses and permits
This page is general information, not legal or tax advice. Confirm dates, fees and procedures with the office named before you act.