What a permit is, and why the listing and the county records disagree
Records, permits and spotting the gap · 1 study hours
Bottom line: A building permit is the city's written OK to build; when a room is added without one, the assessor's record keeps the old count and the listing shows the new one, and that gap is the first clue.
Bottom line first. A listing says 4 bedrooms and 2 baths. The county assessor's record says 3 bedrooms and 1 bath. One of them is wrong, and the usual reason is that someone built a room without a permit. This lesson explains what a permit is, who keeps which record, and why the two drift apart.
What a permit is
A building permit is written permission from the city or county building department to do construction work. You apply, you show plans, you pay a fee, you build, and an inspector (a city employee who checks the work) looks at it at set points. When the last inspection passes, the permit is closed or finaled. That closed permit is the public proof that the work met the building code, the local rule book for safe construction.
Most structural, electrical, plumbing and heating work needs a permit. In Denver the Community Planning and Development department publishes the codes it enforces and guides for residential projects (Denver Community Planning and Development, Building Codes, Policies and Guides). Other cities and counties run their own offices; Colorado Springs and El Paso County share a regional building department. Painting, flooring and swapping a faucet usually do not need one. Framing a new bedroom, finishing a basement, adding a bathroom or moving a wall usually does.
Who keeps which record
- The building department keeps permit history: what was applied for, what was inspected, what was closed, and what was left open.
- The county assessor keeps the property record used to tax the house: square footage, bedroom and bath counts, year built, basement finish. The assessor updates it from closed permits, from field visits and from sales. Most Colorado assessors publish these records online; search by address.
- The listing (the ad an agent writes to sell the house) is whatever the seller and agent say, often based on walking through the house and counting rooms.
Only the first two are government records. The listing is a sales claim.
Why they disagree
Four common reasons, in rough order of how often you see them:
- Unpermitted work. A past owner framed a basement bedroom or added a bathroom with no permit. The assessor never heard about it, so the record still shows the old house.
- Open permit. A permit was pulled but never finaled. The assessor may or may not have picked up the change.
- Assessor lag or error. Even permitted work can take a cycle to show up, and old records have typos.
- Counting rules. The assessor may count only rooms that meet the code's definition of a bedroom, while the listing counts any room with a door.
Your job is not to assume the worst. Your job is to find out which reason applies, because each one costs a different amount to fix.
The one-page check
Before you spend money on an inspection, pull two free pages: the assessor's record and the permit history. Write the listing claim in one column and the records in the next. Any room, bath or square footage that appears in the listing but in neither record is your gap. The rest of this course is about what to do with the gap.
Example with real numbers
Meet the house we will carry through every lesson. It is made up, but the town is real: a 1962 ranch on Larkspur Court in Denver, 1,120 square feet above grade with a full basement. The listing reads 4 bed, 2 bath, 2,100 finished square feet and asks $545,000.
| Item | Listing | Assessor record | Permit history |
|---|---|---|---|
| Bedrooms | 4 | 3 | No bedroom permit |
| Bathrooms | 2 | 1 | No plumbing permit |
| Finished square feet | 2,100 | 1,120 above grade, basement unfinished | Roof and water heater permits only |
The gap: one bedroom, one bathroom and about 980 square feet of basement finish, none of it in any government record. The seller is asking $545,000 for a 4/2. The county is taxing a 3/1. Priya, our buyer, now knows exactly what questions to ask. In the next lesson she walks the basement and checks whether that fourth bedroom could ever legally be called one.
Every dollar and square-foot figure in this example is made up to teach the method.
Law cited
- Denver Community Planning and Development, Building Codes, Policies and Guides
- your county assessor's online property records
Key terms
- Building permit
- Written permission from the city or county building department to do construction work.
- Inspector
- A building department employee who checks permitted work at set points.
- Closed (finaled) permit
- A permit whose last inspection passed; the public proof the work met code.
- Building code
- The local rule book for safe construction, adopted by the city or county.
- Building department
- The local office that issues permits and keeps permit history.
- County assessor
- The county office that records a house's size and room counts to set its taxable value.
- Listing
- The sales ad an agent writes; a claim, not a government record.
- Gap
- Any room, bath or square footage in the listing that appears in neither the assessor record nor permit history.
Flashcards
What is a building permit?
Written permission from the local building department to do construction work.
What does a closed or finaled permit prove?
The last inspection passed and the work met code.
Who keeps permit history?
The city or county building department.
Who keeps bedroom counts and square footage for taxes?
The county assessor.
Is a listing a government record?
No. It is a sales claim by the seller and agent.
Most common reason listing and assessor disagree?
Work done without a permit.
What is an open permit?
A permit pulled but never finaled by a passed inspection.
Larkspur Court: listing vs assessor bedrooms?
Listing 4, assessor 3.
Larkspur Court: the gap in square feet?
About 980 square feet of basement finish.
Which Denver office lists which projects need a permit?
Community Planning and Development.
Quiz: 10 questions
Tap an answer. It shows right or wrong and opens the reason. Your score is saved in this browser and counts in the study app.
A building permit is best described as:
- A A tax bill from the county assessor
- B Written permission from the building department to do construction work
- C A seller's promise that the house is safe
- D A real estate agent's license
Show answer and why
Answer: B. Written permission from the building department to do construction work
A permit is the local government's written OK to build. The assessor taxes; it does not permit work.
Denver Community Planning and Development, Building Codes, Policies and Guides
Which record is NOT a government record?
- A Permit history
- B Assessor property record
- C The listing
- D A closed permit
Show answer and why
Answer: C. The listing
The listing is a sales claim written by the seller and agent. The other three come from the city or county.
Lesson text
Who normally keeps a house's bedroom count and square footage for tax purposes?
- A The county assessor
- B The listing agent
- C The title company
- D The lender
Show answer and why
Answer: A. The county assessor
The assessor records size and room counts to set taxable value. Agents and lenders rely on it.
your county assessor's online property records
A permit that was pulled but never passed its final inspection is called:
- A A finaled permit
- B A closed permit
- C A variance
- D An open permit
Show answer and why
Answer: D. An open permit
Open means not finaled. A closed or finaled permit passed its last inspection.
Lesson text
Which project usually does NOT need a permit?
- A Framing a new basement bedroom
- B Adding a bathroom
- C Painting the living room
- D Moving a load-bearing wall
Show answer and why
Answer: C. Painting the living room
Paint is cosmetic. Framing, plumbing and structural changes are the classic permit items.
Denver Community Planning and Development, Building Codes, Policies and Guides
Larkspur Court lists 4 bedrooms and the assessor shows 3. The bedroom gap is:
- A 0
- B 1
- C 2
- D 3
Show answer and why
Answer: B. 1
4 minus 3 equals 1 bedroom not in the record.
Larkspur Court example (made up)
Larkspur Court lists 2,100 finished square feet; the assessor shows 1,120 above grade and an unfinished basement. The finished-space gap is about:
- A 1,120
- B 2,100
- C 980
- D 500
Show answer and why
Answer: C. 980
2,100 minus 1,120 equals 980 square feet of finish not in the record.
Larkspur Court example (made up)
Which is the most common reason for a listing and assessor record to disagree?
- A The assessor measured the lot instead of the house
- B Work was done without a permit
- C The listing agent used metric units
- D The house was moved
Show answer and why
Answer: B. Work was done without a permit
Unpermitted work never reaches the assessor, so the old count stays. The other choices are not typical.
Lesson text
What is the first free step before paying for an inspection?
- A Hire a structural engineer
- B Make a full-price offer
- C Ask the neighbors
- D Pull the assessor record and permit history and compare them to the listing
Show answer and why
Answer: D. Pull the assessor record and permit history and compare them to the listing
Two free public pages define the gap. Engineers and offers come later.
Lesson text
A bathroom in the listing but not in the assessor record or permit history is:
- A Part of the gap
- B Proof of fraud
- C Automatically illegal to use
- D The assessor's problem only
Show answer and why
Answer: A. Part of the gap
It is a gap to investigate. It may be unpermitted, an open permit, or an assessor lag; you do not know yet.
Lesson text
Spotting unpermitted work: permit lookups, the walk-through and the legal-bedroom test →