shinnslist

Buying, selling and disclosure with a foundation problem

Experts, repairs and the deal · 1 study hours

Bottom line: Colorado makes builders hand new-home buyers a soils report at least fourteen days before closing with a $500 penalty for skipping it, resale sellers disclose what they know on the state form, and a buyer prices the problem by taking the engineer's scope, the cautious bid and a cushion off the clean-house value.

Bottom line first. A foundation problem is not a reason to run. It is a number. Once an engineer has named the fix and contractors have bid it, a buyer, seller or investor can price the house like any other house with a known repair. The law adds two things: a soils disclosure rule for new homes and a seller's disclosure form for resales.

New homes: the soils report rule

Colorado requires that, at least fourteen days before closing the sale of any new residence, the developer or builder give the buyer a copy of a summary report of the soils analysis and the site recommendations. Where significant potential for expansive soils is recognized, the builder must also hand over a publication explaining the problems with such soils, the building methods used to address them, and maintenance steps (C.R.S. 6-6.5-101(1)). A builder who fails to provide the report or publication owes the buyer a civil penalty of five hundred dollars, in addition to any other liability (C.R.S. 6-6.5-101(2)). The rule does not apply to someone building a house as their own residence (C.R.S. 6-6.5-101(3)). The publication builders typically hand out is the state geological survey's homeowner guide to swelling soils (CGS SP-43).

Why this matters for an older house: ask the seller for that original soils report. For a 1970s house it may not exist, but for anything built since the rule it often sits in a drawer, and it tells you what the clay under the house was like on day one.

Resale: the seller's property disclosure

For a used house there is no soils-report rule. Instead, the Colorado Real Estate Commission, the state body that licenses brokers, publishes a Seller's Property Disclosure form that brokers use in nearly every sale. It asks the seller to check what they actually know about the property, and it has a structural section covering the foundation, cracks, movement, drainage and past repairs, plus a place to attach reports. The key words are actual knowledge: the seller must tell what they know, not investigate. A seller who knows about an engineer's letter or a past pier job and hides it is taking on real legal risk; a seller who never saw a crack is not a guarantor. A buyer should read the form, then verify with their own engineer anyway (lesson 3).

Three practical rules for sellers:

  1. If you have a letter, a bid or a repair invoice, attach it. Disclosure of a fixed problem with a close-out letter reads as a strength.
  2. Never patch a crack to hide it right before listing. The crack log in lesson 2 cuts both ways.
  3. Do the water work before listing. It is cheap and it shows care.

How the problem changes the price

The buyer's math is the same house math every lesson has used. Start with what the house would be worth with no foundation issue, the clean value. Subtract the cautious repair bid. Subtract a cushion for surprises. Subtract something for the hassle, the engineer's time and the fact that the next buyer will ask the same questions, a stigma allowance. What is left is a fair offer. The seller can push back on the stigma piece and on the cushion; the engineer's scope and the bids are hard to argue with. A cash investor will use the same steps and simply pick a larger cushion and a profit line.

Three ways to settle it

  • Price reduction: the buyer takes the house as is at a lower price and does the work. Buyer controls the contractor and gets the warranty in their name.
  • Seller repair before closing: the seller pays for the engineer's scope and provides the close-out letter. The buyer should insist the engineer, not the seller, picks the scope.
  • Seller credit at closing: money toward the buyer's costs. Lenders cap credits, so check with the lender first.

Example with real numbers

Dana's made-up 1972 ranch on Cedar Hollow Drive, Lakewood. Listed at $525,000. Every figure is a made-up example.

StepAmount
Clean value (what comparable sound ranches nearby would bring, Dana's estimate)$525,000
Minus cautious repair bid (Bid B, lesson 4)- $26,200
Minus cushion for pier depth surprises- $4,000
Minus stigma and hassle allowance (Dana picks about 1.5% of clean value)- $7,800
Dana's fair offer$487,000

Dana asks for $487,000 and gives the seller a copy of the engineer's letter and all three bids. The seller counters at $500,000 with a seller repair. Dana says yes only if the repair follows the engineer's scope, the warranty transfers, and the engineer writes the close-out letter, with the seller paying the $450 close-out fee. Dana also keeps the right to walk if the close-out letter is not clean.

The seller's view of the same math: the seller spends about $26,200 plus $450 on the engineer, and sells at $500,000 instead of $487,000. The seller nets $500,000 - $26,650 = $473,350, versus $487,000 as-is. In this made-up example the as-is deal is better for the seller by $13,650. Running that comparison before countering is the whole point of carrying one house through the course.

An investor's version: same clean value, same bids, a cushion of $10,000 instead of $4,000, plus a profit line. The offer lands lower, but the steps are identical. Whoever does the math from the engineer's scope, not from fear, prices the house right.

Takeaways

  • New-home builders must deliver the soils report at least fourteen days before closing or owe the buyer $500 (C.R.S. 6-6.5-101).
  • Resale sellers disclose what they actually know on the state form and should attach letters and invoices.
  • Price it: clean value minus cautious bid minus cushion minus stigma allowance.
  • Seller repairs are fine only on the engineer's scope with a transferable warranty and a close-out letter.

Law cited

Key terms

Soils report
A geotechnical engineer's summary of the soil analysis and site recommendations for a building lot.
Seller's Property Disclosure
The Colorado Real Estate Commission form on which a seller reports what they actually know about the property.
Actual knowledge
What the seller truly knows; the disclosure duty is to tell, not to investigate.
Clean value
What the house would be worth with no foundation problem.
Cushion
Extra dollars set aside for repair surprises such as deeper piers.
Stigma allowance
A price deduction for the hassle and the next buyer's questions about a repaired foundation.
Seller credit
Money the seller gives at closing toward the buyer's costs, often capped by the lender.
Civil penalty
A money penalty set by statute, here $500 payable to the buyer by a builder who skips the soils report.

Flashcards

How long before closing must a builder give a new-home buyer the soils report?

At least fourteen days (C.R.S. 6-6.5-101(1)).

Penalty for a builder who skips the soils report?

A $500 civil penalty payable to the purchaser (C.R.S. 6-6.5-101(2)).

Does the soils rule cover someone building their own residence?

No (C.R.S. 6-6.5-101(3)).

Resale seller's duty on the disclosure form?

Report actual knowledge; tell what you know, not investigate.

The buyer's pricing formula?

Clean value minus cautious bid minus cushion minus stigma allowance.

Dana's fair offer in the example?

$487,000.

Seller's net on the $500,000 seller-repair counter?

$500,000 - $26,650 = $473,350, worse than $487,000 as-is.

Three ways to settle a foundation issue in a sale?

Price reduction, seller repair before closing, seller credit at closing.

Condition for accepting a seller repair?

Engineer's scope, transferable warranty, engineer's close-out letter.

Quiz: 10 questions

Tap an answer. It shows right or wrong and opens the reason. Your score is saved in this browser and counts in the study app.

  1. Under C.R.S. 6-6.5-101, a builder must give a new-home buyer the soils summary report at least:

    1. A Fourteen days before closing
    2. B Thirty days before closing
    3. C At closing
    4. D Within a year after closing
    Show answer and why

    Answer: A. Fourteen days before closing

    The statute says at least fourteen days prior to closing the sale of any new residence.

    C.R.S. 6-6.5-101(1)

  2. The civil penalty a builder owes the purchaser for failing to provide the report or publication is:

    1. A $50
    2. B $5,000
    3. C $1,000
    4. D $500
    Show answer and why

    Answer: D. $500

    Subsection (2) sets a civil penalty of five hundred dollars payable to the purchaser, in addition to other liability.

    C.R.S. 6-6.5-101(2)

  3. The soils disclosure rule does NOT apply to:

    1. A Large developers
    2. B An individual building a house for their own residence
    3. C Builders in Douglas County
    4. D Builders of homes with basements
    Show answer and why

    Answer: B. An individual building a house for their own residence

    Subsection (3) exempts an individual constructing a residential structure for his own residence.

    C.R.S. 6-6.5-101(3)

  4. Where significant expansive soil potential is recognized, the builder must also provide:

    1. A A publication on the soil problems, building methods and maintenance
    2. B A free year of landscaping
    3. C A second appraisal
    4. D A home warranty
    Show answer and why

    Answer: A. A publication on the soil problems, building methods and maintenance

    The statute requires a publication detailing the problems with such soils, the building methods and maintenance procedures.

    C.R.S. 6-6.5-101(1)

  5. On the resale disclosure form, a seller's duty is to report:

    1. A Whatever a buyer asks about
    2. B Everything an engineer could find
    3. C What the seller actually knows
    4. D Nothing about the foundation
    Show answer and why

    Answer: C. What the seller actually knows

    The form is based on actual knowledge: tell what you know, not investigate.

    Colorado Real Estate Commission Seller's Property Disclosure

  6. Dana's fair offer: $525,000 - $26,200 - $4,000 - $7,800 equals:

    1. A $490,000
    2. B $494,800
    3. C $498,800
    4. D $487,000
    Show answer and why

    Answer: D. $487,000

    525,000 - 26,200 = 498,800; minus 4,000 = 494,800; minus 7,800 = 487,000.

    Cedar Hollow Drive example (made up)

  7. The seller counters at $500,000 with a seller repair costing $26,200 plus a $450 close-out. The seller's net is:

    1. A $473,350
    2. B $473,800
    3. C $500,000
    4. D $487,000
    Show answer and why

    Answer: A. $473,350

    26,200 + 450 = 26,650; 500,000 - 26,650 = 473,350.

    Cedar Hollow Drive example (made up)

  8. Compared with Dana's $487,000 as-is offer, the seller-repair counter leaves the seller:

    1. A Better off by $13,000
    2. B Worse off by $13,650
    3. C Even
    4. D Better off by $26,650
    Show answer and why

    Answer: B. Worse off by $13,650

    487,000 - 473,350 = 13,650 less for the seller under the repair route in this made-up example.

    Cedar Hollow Drive example (made up)

  9. Which is NOT a condition Dana sets for accepting a seller repair?

    1. A The repair follows the engineer's scope
    2. B The warranty transfers
    3. C The engineer writes a close-out letter
    4. D The seller chooses the number of piers
    Show answer and why

    Answer: D. The seller chooses the number of piers

    The engineer, not the seller, sets the scope. The other three are Dana's conditions.

    Lesson text

  10. A seller credit at closing is:

    1. A Money toward the buyer's costs, often capped by the lender
    2. B A lower list price
    3. C A repair the seller does before closing
    4. D A penalty under the soils statute
    Show answer and why

    Answer: A. Money toward the buyer's costs, often capped by the lender

    A credit is cash toward closing costs and is limited by lender rules; a price reduction and a seller repair are the other two routes.

    Lesson text

← Repair types and how a bid is builtHiring a structural engineer and reading the report →