Who to call: engineer's letter versus contractor's bid
Experts, repairs and the deal · 1 study hours
Bottom line: A licensed structural engineer sells you an independent opinion; a repair contractor sells you a repair, so get the engineer's letter first and let it tell the contractors what to bid.
Bottom line first. Two different people will offer to look at your cracks: a licensed engineer and a foundation repair contractor. The contractor's visit is usually free because the contractor is paid when you buy piers. The engineer's visit costs money because the engineer is paid for the opinion itself. Buy the opinion first. Then use it to make the contractors bid on the same fix.
The cast
- Home inspector: a generalist who looks at the whole house and flags what needs a specialist. An inspector will write "evidence of movement, recommend evaluation by a structural engineer." That is a referral, not a diagnosis.
- Structural engineer: a licensed professional engineer (the state licenses engineers through its regulatory agency) who specializes in how buildings carry loads. The engineer tells you what is wrong, whether it is active, whether the house is safe, and what kind of fix is called for.
- Geotechnical engineer: an engineer who studies the soil itself. For a new build, the soils report and site recommendations come from this person. For an existing house with a bad problem, a geotechnical engineer may drill and test the clay to say how much more it could swell.
- Foundation repair contractor: the company that installs piers, anchors and drainage. Many are skilled. All of them are selling.
What an engineer's letter is
An engineer's letter (sometimes called a structural evaluation or observation report) is a signed, stamped document from a licensed engineer that states what was observed, what is causing it, whether the structure is safe, and what repair, if any, is recommended. Stamped means it carries the engineer's official seal, which puts the engineer's license behind the words. Lenders, insurers, buyers and courts treat that stamp as the serious document. A contractor's bid does none of this. It is a price for a scope of work the contractor chose.
A good letter answers five questions in plain words:
- What is moving, and in which direction (heave or settlement)?
- Is it active or historic?
- Is anything unsafe right now?
- What is the recommended repair, in enough detail that two contractors could bid it the same way?
- What should the owner do about water (grading, downspouts, sprinklers) regardless of the repair?
Levels of engineering help
There is a ladder. The first rung is a visual observation: the engineer walks the house, measures floor levels with a tool, reads the cracks and writes a short letter. The second rung adds a floor level survey, a map of how many inches each part of the floor is above or below a reference point, which shows the shape of the movement. The third rung is a geotechnical study with soil borings. Most resale situations stop at rung one or two. Ask the engineer up front which rung the fee buys.
How to use the letter against the bids
Hand the same letter to two or three contractors and ask each to bid the engineer's scope. Now the bids are comparable. If one contractor says the engineer is wrong and you need twice as many piers, that is a flag, not an upgrade. If the engineer recommends a repair design (a drawing with pier locations and loads), pay for it; it stops scope creep. Finally, ask whether the engineer will do an observation of the repair and write a close-out letter saying the work matched the design. That close-out letter is what the next buyer wants to see.
Questions that separate pros from salespeople
- "Are you licensed as an engineer in Colorado, and will the letter carry your stamp?"
- "Do you install repairs, or only design and observe them?" An engineer who also sells piers has the same conflict as a contractor.
- "Will the letter say whether the movement is active?"
- "What water fixes do you want done no matter what?"
- To a contractor: "Will you bid exactly the engineer's scope, line by line?"
Example with real numbers
Dana's made-up 1972 ranch on Cedar Hollow Drive, Lakewood, list $525,000, is now under contract with an inspection period. The inspection report says "movement observed, recommend structural engineer." Every dollar below is a made-up example, not a typical price.
| Step | Who | Example cost (made up) | What Dana gets |
|---|---|---|---|
| 1 | General home inspector | $550 | Whole-house report plus the referral |
| 2 | Structural engineer, visual plus floor level survey | $900 | Stamped letter: back (east) corner heaving, slab heaved, active, not unsafe, recommends piers at the back wall, slab fix and drainage |
| 3 | Three contractors bid the engineer's scope | $0 | Comparable bids, lesson 4 |
| 4 | Engineer close-out observation after repair | $450 | Letter the next buyer will want |
Dana spends $1,450 on engineering in this example, plus the inspection. The letter also says in plain words that the house is not unsafe, which matters to Dana's lender and to Dana's sleep. Because the letter named active movement, Dana has leverage in lesson 5: the seller cannot say "it has always been like that."
One more point. Had Dana skipped the engineer and taken the free contractor visit, the contractor's scope might have included piers along two walls instead of one. Nobody would have been lying; the contractor simply would have had no stamped letter to argue with. The $900 bought a referee.
Takeaways
- Inspector refers, engineer diagnoses, contractor sells and installs.
- A stamped engineer's letter answers what, which direction, active or not, safe or not, and the fix.
- Make every contractor bid the same engineer's scope.
- Pay for a close-out letter; it is what the next buyer asks for.
Law cited
- Colorado Geological Survey SP-43, A Guide to Swelling Soils for Colorado Homebuyers and Homeowners
Key terms
- Home inspector
- A generalist who checks the whole house and refers specialist issues onward.
- Structural engineer
- A licensed engineer who evaluates how a building carries loads and what repair it needs.
- Geotechnical engineer
- An engineer who studies the soil and writes soils reports and site recommendations.
- Engineer's letter
- A signed, stamped report from a licensed engineer stating cause, activity, safety and recommended repair.
- Stamped
- Carrying the engineer's official seal, which puts the license behind the document.
- Floor level survey
- A measured map of how high or low each part of a floor sits relative to a reference point.
- Repair design
- An engineer's drawing specifying pier locations and loads so contractors bid the same work.
- Close-out letter
- An engineer's letter after repair stating the work matched the design.
Flashcards
Why is a contractor's visit usually free?
The contractor is paid when you buy the repair.
What does a home inspector do about cracks?
Flags movement and refers you to a structural engineer.
What does 'stamped' mean?
The engineer's official seal is on it, putting the license behind the words.
Five things a good letter answers?
What moves, which direction, active or not, safe or not, and the fix.
Geotechnical vs structural engineer?
Geotechnical studies the soil; structural studies the building.
Why bid the engineer's scope, not the contractor's?
So bids are comparable and scope cannot grow.
What is a floor level survey?
A map of how high or low each area of floor is.
What does the next buyer want after a repair?
The engineer's close-out letter.
Dana's made-up total engineering spend?
$900 letter plus $450 close-out = $1,350, plus $550 inspection.
Quiz: 10 questions
Tap an answer. It shows right or wrong and opens the reason. Your score is saved in this browser and counts in the study app.
Who is paid for the opinion itself rather than for selling a repair?
- A Foundation repair contractor
- B Pier salesperson
- C Licensed structural engineer
- D Landscaper
Show answer and why
Answer: C. Licensed structural engineer
The engineer charges for the evaluation. Contractors earn when you buy the repair, so the visit is free.
Lesson text
A home inspector's report that says 'recommend evaluation by a structural engineer' is:
- A A diagnosis
- B A referral, not a diagnosis
- C A repair bid
- D A stamped letter
Show answer and why
Answer: B. A referral, not a diagnosis
Inspectors are generalists who flag and refer; the engineer makes the diagnosis.
Lesson text
Which professional studies the soil itself and writes soils reports?
- A Geotechnical engineer
- B Home inspector
- C Real estate broker
- D Title company
Show answer and why
Answer: A. Geotechnical engineer
Geotechnical engineers test and report on soil; structural engineers focus on the building.
Lesson text
Which is NOT one of the five questions a good engineer's letter answers?
- A Is the movement active?
- B Is the house safe right now?
- C What repair is recommended?
- D What color should the basement be painted?
Show answer and why
Answer: D. What color should the basement be painted?
Paint color is not structural. The letter covers what moves, direction, activity, safety and the fix.
Lesson text
The engineer's stamp matters because it:
- A Makes the letter longer
- B Puts the engineer's license behind the statements
- C Lowers the repair price
- D Replaces a building permit
Show answer and why
Answer: B. Puts the engineer's license behind the statements
A stamped document carries the engineer's professional responsibility, which is why lenders and buyers rely on it.
Lesson text
In Dana's example, the made-up fee for the engineer's visual plus floor level survey was:
- A $450
- B $550
- C $900
- D $1,350
Show answer and why
Answer: C. $900
The table lists $900 for the letter; $450 is the close-out and $550 the general inspection, all made-up figures.
Cedar Hollow Drive example (made up)
A contractor says the engineer is wrong and you need twice as many piers. The lesson calls that:
- A A flag, not an upgrade
- B Normal and should be accepted
- C A reason to skip the engineer next time
- D Proof the engineer was unlicensed
Show answer and why
Answer: A. A flag, not an upgrade
Scope that grows beyond the stamped letter is a warning sign; make the contractor bid the engineer's scope.
Lesson text
Dana's total made-up engineering spend (letter plus close-out, not counting the inspection) was:
- A $900
- B $1,900
- C $550
- D $1,350
Show answer and why
Answer: D. $1,350
$900 + $450 = $1,350. Adding the $550 inspection gives $1,900, but the question excludes it.
Cedar Hollow Drive example (made up)
The first rung of engineering help described in the lesson is:
- A Soil borings
- B A full repair design
- C A visual observation with a short letter
- D Installing piers
Show answer and why
Answer: C. A visual observation with a short letter
The ladder starts with a visual observation, then a floor level survey, then geotechnical borings.
Lesson text
An engineer who also sells and installs piers has:
- A No conflict at all
- B The same conflict of interest as a contractor
- C A higher license
- D A duty to work for free
Show answer and why
Answer: B. The same conflict of interest as a contractor
Anyone paid when you buy the repair has an incentive to recommend it, which is why the lesson asks that question.
Lesson text
← Reading the signs: which cracks matter and which are cosmeticRepair types and how a bid is built →