---
title: "Hiring a structural engineer and reading the report"
description: "Hire a licensed structural engineer who works for you and not for a repair contractor, pay for a written stamped report with a floor-level survey, and."
url: "https://shinnslist.com/courses/foundation-expansive-soil/fnd-06-hiring-a-structural-engineer-and-reading-the-report"
---

> Hire a licensed structural engineer who works for you and not for a repair contractor, pay for a written stamped report with a floor-level survey, and.

[Foundation Cracks and Expansive Soil in Colorado Homes: Free Course](/courses/foundation-expansive-soil/) Light or dark

[Free Courses](/courses/) › [Foundation and soil course](/courses/foundation-expansive-soil/) › [Going deeper](/courses/foundation-expansive-soil/#s3) › Lesson 6

# Hiring a structural engineer and reading the report

Going deeper · 1 study hours

**Read once:** This course is general education, not legal, engineering or financial advice. Every dollar figure is a made-up example; a real house needs a licensed engineer's opinion and real bids.

**Bottom line:** Hire a licensed structural engineer who works for you and not for a repair contractor, pay for a written stamped report with a floor-level survey, and read it for five answers: what moved, which direction, is it active, is it safe, and the exact scope of the fix.

**Bottom line first.** The engineer's report is the one document that turns a scary crack into a priced repair. Lesson 3 explained who the engineer is; this lesson is about how to hire one well and how to read what comes back, line by line, so you can tell a solid report from a thin one.

### Who to hire

You want a **licensed professional engineer**, which means a person who holds a state engineering license and can put a **stamp** (the official seal that makes the report their professional word) on the letter. Ask three questions before booking: do you specialize in residential foundations, do you also sell repairs (the answer you want is no), and will I get a written stamped report with a floor-level survey? A **floor-level survey** is a measured map of how far each part of the floor sits above or below a reference point, usually drawn as a grid of numbers across the plan.

The reason for the no-repairs rule is simple. A contractor's free visit ends in a bid; an engineer's visit ends in a diagnosis. The Colorado Geological Survey wrote its homeowner guide because swelling soil "is capable of causing severe damage to houses" and the damage "may occur slowly over time" (Colorado Geological Survey SP-43). Slow movement is exactly the kind a one-time visual look can misjudge, so you want an independent referee who measures.

### What to send before the visit

- Your crack photos from lesson 2 with dates.

- Any prior repair paperwork or warranties the seller handed over.

- The original **soils report** if the house was new enough to have one. For new homes, Colorado requires the builder to give the buyer a summary soils report at least fourteen days before closing (C.R.S. 6-6.5-101(1)); on a 1970s resale there usually is none, and you say so.

### Reading the report: five answers

A good report, whatever its length, answers five questions. Read for them in this order.

- **What moved.** Footing, slab, basement wall, or a partition wall that was never meant to carry load. The report should name the element and the location (for example, back east corner).

- **Which direction.** **Heave** is ground pushing up; **settlement** is ground dropping away. Expansive clay usually heaves; the fix for each is different, so this word drives the whole bid.

- **Active or dormant.** **Active movement** means it is still going; **dormant** means it moved once and stopped. Engineers decide this from crack freshness, the floor survey and sometimes a second survey months later, called **monitoring**.

- **Safe or not.** A plain sentence on whether the structure is a life-safety concern. Lenders and insurers read this line first.

- **Scope of repair.** The exact fix: how many **piers** (steel supports driven or screwed down to stable ground and attached to the footing), where, plus any slab, wall or drainage work. This scope is what every contractor must bid, as lesson 4 explained.

### Red flags in a report

- No floor-level survey, only words like "some movement noted."

- No stamp, or a stamp from a different discipline than structural.

- A scope that says "contractor to determine pier count." That hands the referee's whistle to the salesman.

- No statement on active versus dormant. Without it, nobody can say whether the fix is urgent or can wait.

### Example with real numbers

Dana's made-up 1972 ranch on Cedar Hollow Drive, Lakewood, under contract at a $525,000 list price. Every dollar below is a made-up example, not a typical price.

Dana calls three engineers. Engineer One sells repairs too, so Dana passes. Engineer Two offers a $450 visual-only letter with no survey. Engineer Three offers a $900 visit with a floor-level survey and a stamped report, plus an optional $350 return visit in ninety days to re-survey if the first survey suggests active movement. Dana books Engineer Three.

| Report section | What it says (made-up example) | What Dana does with it |
| --- | --- | --- |
| Floor survey | Back east corner 1.6 inches high relative to the front door; basement partition heaved 0.9 inch | Confirms heave, not settlement; matches the diagonal cracks from lesson 2 |
| Direction | Heave from expansive clay under the back footing and slab | Rules out settlement-style fixes |
| Activity | Fresh crack edges, no dust; likely active | Leverage with the seller in lesson 5; may add the $350 re-survey |
| Safety | Not a life-safety concern at this time | Keeps the lender comfortable |
| Scope | 7 piers along the back wall, cut and re-void the partition, repair slab, regrade and extend downspouts | Becomes the one scope all three contractors bid in lesson 4 |

Dana's engineering spend so far is $900, and $1,250 if the re-survey is added. Against a $525,000 house, the $900 report is a fraction of one percent of the price and it fixed the pier count at seven. In lesson 4, the one bid that ignored the report added three piers at $2,100 each, or $6,300 of work the referee never called for. In this example the report paid for itself seven times over on that single line.

One more read-through tip: Dana checks that the scope says "7 piers" and not "approximately 7 piers." If it says approximately, Dana asks the engineer for a pier layout sketch before the bids go out. Contractors bid sketches, not adjectives.

### Takeaways

- Hire a licensed, stamping engineer who does not sell repairs.

- Insist on a floor-level survey in writing.

- Read for five answers: what, which direction, active, safe, scope.

- A scope with a fixed pier count is the referee; approximate counts invite padded bids.

## Law cited

- Colorado Geological Survey SP-43, A Guide to Swelling Soils for Colorado Homebuyers and Homeowners
- C.R.S. 6-6.5-101

## Key terms

Licensed professional engineer A person holding a state engineering license who may seal (stamp) engineering documents. Stamp The engineer's official seal on a report, making it their professional word. Floor-level survey A measured grid showing how high or low each part of the floor sits relative to a reference point. Soils report A geotechnical summary of the soil analysis and site recommendations for a lot. Heave Upward movement of a foundation caused by soil pushing up. Settlement Downward movement caused by soil dropping or compressing under the foundation. Active movement Foundation movement that is still happening. Dormant Movement that happened once and has stopped. Monitoring Repeating a survey months later to see whether movement continues. Piers Steel supports installed down to stable ground and attached to the footing to carry the house.

## Flashcards

### Three hiring questions for an engineer?

Residential foundations specialty? Do you sell repairs (want no)? Written stamped report with floor-level survey?

### Why hire an engineer who does not sell repairs?

A contractor's visit ends in a bid; an engineer's visit ends in a diagnosis.

### What is a floor-level survey?

A measured grid of how far each part of the floor sits above or below a reference point.

### Five answers to read for in a report?

What moved, which direction, active or dormant, safe or not, exact scope.

### Heave versus settlement?

Heave is ground pushing up; settlement is ground dropping away.

### Why does CGS say swelling soil is hard to judge in one visit?

The damage may occur slowly over time (SP-43).

### When must a builder give a new-home buyer the soils report?

At least fourteen days before closing (C.R.S. 6-6.5-101(1)).

### Dana's engineer fee with the re-survey in the example?

$900 + $350 = $1,250 (made-up).

### What did the fixed pier count save Dana in the example?

Bid C added 3 piers at $2,100 = $6,300 the engineer never called for.

### Biggest red flag in a scope line?

"Contractor to determine pier count" or "approximately"; it hands the decision to the salesman.

## Quiz: 10 questions

Tap an answer. It shows right or wrong and opens the reason. Your score is saved in this browser and counts in the [study app](/courses/foundation-expansive-soil/study).

- The engineer you want for a foundation opinion should:
**A** Also sell and install the repair so one call does it all
- **B** Hold a license, stamp a written report and not sell repairs
- **C** Be the home inspector who found the crack
- **D** Be chosen by the lowest fee only

### Show answer and why

**Answer: B.** Hold a license, stamp a written report and not sell repairs

An independent licensed engineer diagnoses; a contractor sells. The stamped report is the referee.

Colorado Geological Survey SP-43

- A floor-level survey is:
**A** A list of cracks with photos
- **B** A soil boring log from the lot
- **C** A measured grid of how high or low each part of the floor sits
- **D** The county's flood map

### Show answer and why

**Answer: C.** A measured grid of how high or low each part of the floor sits

It measures relative floor elevations across the plan, which shows heave or settlement and how much.

Colorado Geological Survey SP-43

- Heave means the foundation:
**A** Dropped because soil compressed
- **B** Cracked from a frozen pipe
- **C** Was pushed up by swelling soil
- **D** Was never poured level

### Show answer and why

**Answer: C.** Was pushed up by swelling soil

Heave is upward movement; expansive clay usually heaves rather than settles.

Colorado Geological Survey SP-43

- The Colorado Geological Survey says swelling-soil damage:
**A** May occur slowly over time
- **B** Always appears within the first year
- **C** Only happens in Douglas County
- **D** Cannot damage a house with a basement

### Show answer and why

**Answer: A.** May occur slowly over time

SP-43 says the damage may occur slowly over time, which is why measurement beats a single glance.

Colorado Geological Survey SP-43

- For a NEW home in Colorado, the builder must give the buyer the soils summary report:
**A** Only if the buyer asks in writing
- **B** Within thirty days after closing
- **C** Never; it is the buyer's job
- **D** At least fourteen days before closing

### Show answer and why

**Answer: D.** At least fourteen days before closing

C.R.S. 6-6.5-101(1) sets the fourteen-day rule for new residences.

C.R.S. 6-6.5-101(1)

- Which report line do lenders and insurers usually read first?
**A** Whether the structure is a life-safety concern
- **B** The engineer's hourly rate
- **C** The paint color of the basement
- **D** The number of photos attached

### Show answer and why

**Answer: A.** Whether the structure is a life-safety concern

The safety statement decides whether the deal and coverage can proceed.

Colorado Geological Survey SP-43

- Active movement means:
**A** The house is unsafe
- **B** The movement is still happening
- **C** The movement stopped years ago
- **D** The soil is sandy

### Show answer and why

**Answer: B.** The movement is still happening

Active means ongoing; dormant means it moved once and stopped. Safety is a separate question.

Colorado Geological Survey SP-43

- In the made-up example, Dana's total engineering spend including the re-survey is:
**A** $450
- **B** $900
- **C** $1,250
- **D** $6,300

### Show answer and why

**Answer: C.** $1,250

$900 for the surveyed report plus a $350 return visit equals $1,250 in the example.

Colorado Geological Survey SP-43

- The example bid that ignored the report added three piers at $2,100 each, which is:
**A** $2,100
- **B** $4,200
- **C** $8,400
- **D** $6,300

### Show answer and why

**Answer: D.** $6,300

3 times $2,100 = $6,300 of work the engineer never called for (made-up example).

Colorado Geological Survey SP-43

- A scope line that reads "contractor to determine pier count" is:
**A** Normal and fine
- **B** A red flag: it hands the decision to the salesman
- **C** Required by Colorado law
- **D** Only a problem on new homes

### Show answer and why

**Answer: B.** A red flag: it hands the decision to the salesman

The engineer's fixed count is what makes bids comparable; an open count invites padding.

Colorado Geological Survey SP-43

[← Buying, selling and disclosure with a foundation problem](/courses/foundation-expansive-soil/fnd-05-buying-selling-and-disclosure-with-a-foundation-problem)[Pricing a house with foundation trouble: repair bids, buyer discounts and disclosure →](/courses/foundation-expansive-soil/fnd-07-pricing-a-house-with-foundation-trouble-repair-bids-buyer)

## After you study

[Cracked foundation you'd rather not fix? Get a no-pressure as-is cash offer](/offer)

[Make a free account](/join)

---
Agent index: [https://shinnslist.com/llms.txt](https://shinnslist.com/llms.txt)
